Order of the Arrow Conclave Work Projects

 

All OA members are invited to help with the work projects listed here. 

In particular, help is needed with the Feb 10 and Feb 17 workdays.

 

Date

Project Materials Needed Tools Needed
11/11/2006 Brush Clearing / Grading Roads Lumber, Supplies, Dirt Bush wackers, Carpentry stuff, Heavy Equipment
12/2/2006 Chip / Drag Trees / Bridge Construction Tree Chipper, Lumber, Supplies Bush wackers, Carpentry stuff
1/13/2007 Stain Staff Cabins Stain Scaffolding, Brushes, Rollers
1/20/2007 Stain Staff Cabins Stain Scaffolding, Brushes, Rollers
2/10/2007 Brush Clearing / Gravel Roads   Bush wackers, wheelbarrows
2/17/2007 Paint Handicraft Building Primer Paint, Paint, Trip Scaffolding, Brushes, Rollers
3/10/2007 Power Wash Exterior Dining Hall Powerwash, Brushes  

SPW

3/17/2007

Paint Exterior Dining Hall Paint, Trim Ladders, Brushes, rollers, Extensions
3/24/2007 Power Wash Trading Post / Deck; Admin Powerwash, Brushes  
3/31/2007 Paint Trading Post / Deck; Admin Primer Paint, Paint, Trim Ladders, Brushes, rollers, Extensions
4/7/2007 Power Wash Shelter Floors Detergent? Power Washers
4/14/2007 Landscaping / Brush Clearing    
4/20/2007 - 4/22/2007 Conclave    

 

Other Projects:

  • Paint Basketball Goal
  • Repair Bleachers
  • Chip / Drag Trees